ended8월 1일· 1 sources
The Date Was Visible. The Model Was Null.
Why it matters
The Date Was Visible. The Model Was Null. The form showed a selected date. Save said the date was required. That sounds like a validation bug, but the validator was reporting the truth: the nullable ....
1
Sources
+0
24h
—
Growth
51d
Active